Premier Mounts Indoor Furnishings PP FCTA QL User Manual

INSTALLATION INSTRUCTIONS  
PP-FCTA-QL  
Ceiling Adapter  
EUROPE  
Swallow House,  
Shilton Industrial Estate,  
Shilton, Coventry, England CV79JY  
Phone: +44 (0) 2476 614700  
Fax: +44 (0) 2476 614710  
NORTH AMERICA  
3130 East Miraloma Avenue  
Anaheim, CA 92806 USA  
USA and Canada –  
Phone: 800-368-9700  
Fax: 800-832-4888  
Other Locations – Phone: (001)-714-632-7100; Fax: (001)-714-632-1044  
©Premier Mounts 2008  
9533-030-001-01  
 
PP-FCTA-QL  
Parts List  
This ceiling adapter comes packaged with installation hardware and components. Make sure that none of these parts  
are missing and/or damaged before beginning installation. If there are parts missing and/or damaged, please stop the  
installation and contact Premier Mounts (800-368-9700).  
1/4-20 Wing Nuts  
(Qty 4)  
Ceiling Adapter  
(Qty 1)  
M5 x 16 Phillips Head  
Screws (Qty 5)  
Quick Locks  
(Qty 4)  
¼” x 3” Eye Lag Screws  
(Qty 4)  
1/16” Braided Cable  
(Qty 4 Strands)  
¼” x 3” Concrete Anchors  
(Qty 4)  
Installation Tools  
Phillips Head Screwdriver  
Cable Cutters  
Ladder  
Installation Instructions  
Page 3  
 
PP-FCTA-QL  
Plate Assembly  
Read all cautions and warnings before continuing.  
1/4-20 Wing Nuts  
Step 1. Assemble the plate.  
Step 2. Place the lower adapter plate with the threaded  
studs on it up through mounting plate.  
Step 3. The threaded studs will align with the  
adjustable slide on the mount.  
Upper Adapter  
Plate  
Step 4. Once the two pieces are together, align the  
mounting holes on the upper adapter plate with  
the threaded shafts of the lower adapter plate.  
Step 5. Place the three units together and loosely attach  
four (4) 1/4-20 wing nuts onto the threaded  
shafts.  
Mount  
Adjustable Slide  
Wing Nut Threaded  
Studs  
Lower Adapter  
Plate  
Step 6. Pre-set the M5 x 16 Phillips screws (two on  
each outer ends) of the plate and one (1) on the  
1½” NPT coupler.  
Step 7. Observe the room and the ceiling; find the most  
appropriate location for the projector placement  
and lightly mark the bottom of the tile.  
3"  
M5 x 16mm  
Screws  
Slider Plate  
Step 8. Remove any of the 24” x 24” or 24” x 48” tiles  
that are surrounding the marked tile.  
Step 9. Measure 3” from the edge of the t-bar to the  
inside of the tile (do this for all four edges of the  
ceiling tile).  
Ceiling Plate  
Assembly  
Mounting Hole  
Step 10. The mounting hole should be located in the  
center-most location of the ceiling tile.  
Step 11. Once the mounting hole has been cut, place the  
ceiling plate assembly on the t-bar rails.  
3"  
3"  
3"  
3"  
T-Bar Frame  
Ceiling Tile  
Page 4  
Installation Instructions  
 
PP-FCTA-QL  
Securing the Plate  
T-Bar Frame Rails  
Adjust and Tighten  
Wing Nut  
M5 x 16mm Set  
Screw  
Tiles  
Step 1. Position and slide the adapter plate to the hole and secure the ceiling plate to the rails by tightening the four (4) M5 x 16mm  
Phillips head screws.  
Step 2. Center the stud plate to the hole and secure the plate by tightening the four wing nuts..  
Electrical Box Installation  
Electrical installation should be done in accordance to local codes and regulations.  
Step 1. Cut the tile where the electrical base box is going to be secured.  
Step 2. Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure  
it to the plate.  
Step 3. Make all electrical connections at this time.  
CUT  
Electrical Box  
Cut-out  
Installation Instructions  
Page 5  
 
PP-FCTA-QL  
The electrical cut-outs allow for both single and square electrical box installations.  
Electrical Box  
Page 6  
Installation Instructions  
 
PP-FCTA-QL  
Ceiling Anchoring  
THE PP-FCTA-QL MUST SECURED USING THE SUPPLIED QUICK LOCKS AND  
BRAIDED CABLES.  
Truss  
Concrete  
Wood  
Truss  
Concrete  
Wood Joist  
Eye Lag Hole  
Loop  
Eye Lag Hole  
Loop  
Braided Cable  
Braided Cable  
Concrete  
Truss ceiling  
Wood joist  
Step 1. Determine the mounting  
location.  
Step 2. Use a 1/4” masonry drill bit  
to pre-drill the mounting  
holes.  
Step 3. Place the concrete anchor  
into the pre-drilled hole and  
gently tap into place using a  
rubber mallet or hammer.  
Step 1. Loop the braided cable  
around the truss.  
Step 2. Run the open end through  
the loop.  
Step 3. Pull the open end down until  
the braided cable tightens  
around the truss.  
Step 1. Secure the four (4) ¼” eye  
lag screws to the wood joist  
in the ceiling.  
Step 2. Make sure eye lag screws  
are properly secured to the  
joistbeforesecuringthecable  
to the cable locks on the  
plate.  
Step 3. Run the open end through  
the hole in the eye lag  
screw.  
Step 4. Run the open end through  
the loop.  
Step 5. Pull the open end down until  
the braided cable tightens  
around the eye lag screw.  
Installation Instructions  
Page 7